You don't have javascript enabled. Good luck with that.
Pencarian
Satpel SDA Cilandak Bangun Saluran Air di Jalan H. Riin Lebak Bulus

New Channel Constructed on Jalan Haji Riin

Cilandak Sub-district's Water Resource Implementer Unit, South Jakarta is constructing water channel on Jalan Haji Riin, RT 03/01, Lebak Bulus Urban Village.

We deploy five personnel and one excavator

Sub-district's Implementer Unit Head, Yansori said the new water channel is constructed based on local resident's aspiration in 2023 Musrenbang.

Solutions to Inundation in Rawa Buaya Being Worked On

"We deploy five personnel and one excavator," he said, Tuesday (2/6).

According to him, the 187 m x 40 cm channel construction is already started on January 29, 2024.

"Personnel install U-ditch in size 40x40 meter. It is targeted to complete in two weeks," he added.

He hoped the new channel will prevent inundation or flood in the area.

"I appeal the resident to take care the channel's cleanliness," he continued.

Meanwhile, Sasti (41) local resident, admitted the area was often inundated because of no water channel.

"Thank you for providing water channel here. Hopefully the area will be free from inundation during rainy season," she hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye900 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye601 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye578 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye568 personFakhrizal Fakhri
  5. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye431 personNurito