You don't have javascript enabled. Good luck with that.
Pencarian
Satpel SDA Cilandak Bangun Saluran Air di Jalan H. Riin Lebak Bulus

New Channel Constructed on Jalan Haji Riin

Cilandak Sub-district's Water Resource Implementer Unit, South Jakarta is constructing water channel on Jalan Haji Riin, RT 03/01, Lebak Bulus Urban Village.

We deploy five personnel and one excavator

Sub-district's Implementer Unit Head, Yansori said the new water channel is constructed based on local resident's aspiration in 2023 Musrenbang.

Solutions to Inundation in Rawa Buaya Being Worked On

"We deploy five personnel and one excavator," he said, Tuesday (2/6).

According to him, the 187 m x 40 cm channel construction is already started on January 29, 2024.

"Personnel install U-ditch in size 40x40 meter. It is targeted to complete in two weeks," he added.

He hoped the new channel will prevent inundation or flood in the area.

"I appeal the resident to take care the channel's cleanliness," he continued.

Meanwhile, Sasti (41) local resident, admitted the area was often inundated because of no water channel.

"Thank you for providing water channel here. Hopefully the area will be free from inundation during rainy season," she hoped.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1783 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1556 personFakhrizal Fakhri
  3. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1152 personFakhrizal Fakhri
  4. Commission E Enlists Religious Leaders to Fight Drugs and Violence

    access_time24-07-2026 remove_red_eye1133 personFakhrizal Fakhri
  5. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1128 personBudhi Firmansyah Surapati