You don't have javascript enabled. Good luck with that.
Pencarian
Satpel SDA Cilandak Bangun Saluran Air di Jalan H. Riin Lebak Bulus
....
photo Tiyo Surya Sakti - Beritajakarta.id

New Channel Constructed on Jalan Haji Riin

Cilandak Sub-district's Water Resource Implementer Unit, South Jakarta is constructing water channel on Jalan Haji Riin, RT 03/01, Lebak Bulus Urban Village.

We deploy five personnel and one excavator

Sub-district's Implementer Unit Head, Yansori said the new water channel is constructed based on local resident's aspiration in 2023 Musrenbang.

Solutions to Inundation in Rawa Buaya Being Worked On

"We deploy five personnel and one excavator," he said, Tuesday (2/6).

According to him, the 187 m x 40 cm channel construction is already started on January 29, 2024.

"Personnel install U-ditch in size 40x40 meter. It is targeted to complete in two weeks," he added.

He hoped the new channel will prevent inundation or flood in the area.

"I appeal the resident to take care the channel's cleanliness," he continued.

Meanwhile, Sasti (41) local resident, admitted the area was often inundated because of no water channel.

"Thank you for providing water channel here. Hopefully the area will be free from inundation during rainy season," she hoped.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye555 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye447 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti